Here are some examples of our past projects:
Cadworx 3D model of BW Nexus module
Module ready for load out
Lifting of Module
Cadworx 3D model of LH4-1
Cadworx 3D model of LH4-1
EFE was involved in the plumbing system design and detail engineering for the Su Tu Vang Project.
Su Tu Vang CPP Platform load-out
Su Tu Vang LQ Module under construction
Weighing 790 MT (dry), this MEG module measures 24.5M long, 14M wide and 24m high and was designed by EFE between 2007 and 2008 as part of the subcontract with Petreco for three other modules for Petrobras FPSO Cicade de Sao Mateus Project.
Cadworx 3D model of M35
M35 Module being lifted onto transportation barge to shipyard
This 530 MT (dry) MEG module is a 4-level deck module measuring 19.5M long, 12.3M wide and 21M high. Detail design for piping, structural and deluge system was carried by EFE under subcontract with Petrecco in 2007 to 2008 for PMXL-1 Platform of Mexilhao Field Development.
This 1390 MT (dry) Oil Separation Module is 40m long, 26.8m wide and 17m high is part of 2-part module to be installed on Petrobras FPSO P-53. Detail piping and structural design was performed by EFE between 2006 to 2007 with fabrication carried out by a local yard in Singapore. The design contract was awarded to EFE by Petreco together with P03B and P01 modules.
Cadworx 3D model of P03A module
Lifting of P03A Module
P03A Module being lifted by crane barge
This second part of the two-part module weighs 1270 MT (dry) and measures 40m long, 26.8 m wide and 17m high. It houses the second train of the oil separation facilities on FPSO P-53. Detail engineering for piping, structural and firewater deluge system was performed by EFE with fabrication carried in a local yard in Singapore.
Cadworx 3D model of P03B module
Lifting of P03B Module
P03B Module being lifted by crane barge
This 650 MT (dry) gas treatment and dehydration module is 18M long, 12.3M wide and 20.5M high and was designed by EFE and fabricated in Singapore yard between 2006 to 2007, under subcontract with Petreco.